Specialty Contractor’s Technology Shift Redefines the ‘Impossible’ on Mixed-Use Project

May 18, 2020

Overview

For Ken Neyer Plumbing, one of Ohio’s top specialty contractors, designing, fabricating and installing the necessary plumbing systems for the Liberty Center’s mega primary structures was a complex challenge that required speed, accuracy and an unexpected technology shift.

Challenge

Sleeves and hangers couldn’t be laid out using conventional methods due to challenging wall angles and hiring a surveyor or civil engineer didn’t coincide with their aggressive pour schedule.

Our Approach

An in-house software solution that enabled the 3D model with hanger points to be viewed in the field with a tablet controller for easy field location and staking.

Solution

Trimble FieldLink layout solution, which includes Trimble FieldLink software with a rugged Trimble Field Tablet connected to a Trimble Robotic Total Station.

“The Trimble Robotic Total Station is now an integral part of our field layout workflow on this job and all others down the road.”
- Jim Mercer, Commercial Project Manager, Ken Neyer Plumbing

Results

With FieldLink, Ken Nyer Plumbing was able to lay out sleeves and hangers in-house while keeping to the concrete pour schedule. They gained efficiencies and found that Trimble’s MEP layout solution provided more options, flexibility and long-term applications.

Previous Flipbook
Axxess Data maîtrise la numérisation 3D
Axxess Data maîtrise la numérisation 3D

Axxess Data constate des gains de rentabilité conséquents sur le terrain et au bureau grâce à son utilisati...

Next Video
Trimble Connect for HoloLens & Microsoft Dynamics Remote Assist
Trimble Connect for HoloLens & Microsoft Dynamics Remote Assist

The Trimble XR10 is a powerful tool for construction sites today, when combined with the Microsoft Dynamic ...