FTG - Case Studies
This Stream includes all of our FTG - Case Studies Flipbooks
-
Shell Customer Story
-
Trinity Customer Story - Trimble Ri
Trinity Construction & Design Accelerates Layout and Ensures Accuracy with Trimble Ri Robotic Total Station
-
Turner Construction - Seattle Aquarium - Customer Story
Turner Construction Brings Unique Seattle Aquarium Ocean Pavilion to Life with Trimble Technology
-
Dick Anderson Customer Story - Trimble X7
Trimble X7 3D Laser Scanner Helps Dick Anderson Ensure Accuracy and Avoid Rework
-
KRS Electric - Trimble X7 Customer Story
KRS Electric Increases Accuracy and Efficiency with Trimble X7 3D Laser Scanner
-
Laing O'Rourke - Connect AR - Customer Study
Laing O'Rourke Reduces Waste and Increases Certainty with Connect AR
-
Myco Mechanical Stays Ahead of the Curve
Discover how Myco Mechanical is staying ahead of the curve with Trimble Connect AR.
-
Power Design Experiences the Future of Layout with Trimble FieldLink MR
Discover how Power Design, Inc. experienced FieldLink MR — our new mixed reality solution transforming the future of layout.
-
Southland Customer Story - GNSS
Southland Industries Performs 30% Faster Layout on Massive LAX Project Using Trimble SPS986 GNSS Smart Antenna and Trimble FieldLink Software
-
Mortenson/Scull Case Study - Scanning
The Project: The Monument, a new 250,000 square-foot indoor arena in Rapid City, South Dakota using the Trimble X7 3D Laser Scanner and Trimble FieldLink
-
Warner Mechanical Case Study - 3D Laser Scanning
See how the speed and accuracy of the Trimble X7 is helping Warner Mechanical save time and labor resources. What previously took 2-3 days using a tape measure and paper is now easily done in one day.
-
C.D. Smith Case Study - RTS Layout
Learn how C.D. Smith increased its layout efficiency and gained a five-time increase in productivity using Robotic Total Station.
-
Beck Group Case Study - Layout
The Beck Group will continue to use Trimble’s software and hardware solutions to facilitate a collaborative workflow among all key stakeholders and to maximize the productivity and efficiency.
-
Rumbo Norte Case Study - 3D Laser Scanning
With Trimble's 3D laser technology, Rumbo Norte gained efficiency, speed and accuracy while presenting new lines of business to their customers. Read how:
-
Specialty Contractor’s Technology Shift Redefines the ‘Impossible’ on Mixed-Use Project
With FieldLink, Ken Nyer Plumbing was able to lay out sleeves and hangers in-house while keeping to the concrete pour schedule. They gained efficiencies and found that Trimble’s construction layout so
-
Arden Engineering - 3D Laser Scanning
Trimble’s scanning technology along with the ability to convert point clouds into modeled 3D components, sets Arden Engineering Constructors apart as a leading HVAC/MEP services contractor.
-
Cohn Construction Develops Powerful 3D Design Workflows
Premium design-build contractor cuts design coordination and drawing review time by 90% and saves thousands in survey costs with construction layout tools from Trimble.
-
Fire Protection Contractor Implements Robotic Layout
Fire Protection Contractor Simplifies Complex Connections with Robotic Layout Technology
-
EC Electric saves 90% in labor by investing in Trimble 3D scanning and modeling
TX6 scanner provides the ideal combination of speed, range, and accuracy to capture 3D spatial data and efficiently create 3D deliverables.
-
Robotic Technology Proves Integral to MEP Firm’s BIM-to-Field Goals
While working on a mixed use development in Dubai, United Arab Emirates, Trans Gulf Electromechanical, sought to improve its transfer of design data to the field and back with help from robotic layout
- Loading More...